Tampa Electric has supplied the Tampa Bay area with electricity since 1899.

服务区域

Tampa Electric serves about 2,000 square miles in West Central Florida, including Hillsborough County and part of 波尔克, Pasco and Pinellas Counties, which includes more than 800,000客户.

太阳能 Projects

We are Florida's top producer of solar energy per customer. By 2023, Tampa Electric will have 1,200 MW of photovoltaic solar energy to its fleet, which is enough electricity to power more than 200,000个家庭. 当完成, about 14 percent of Tampa Electric's energy generation will come from the sun – a higher percentage of solar than any other Florida utility.

View our growing list of large-scale solar projects and increasing solar generation.

Power Stations

Tampa Electric has three electric generating plants in service, with generating capability of more than 5,000 MW. These plants and their generating capabilities are listed below:

  MW
湾侧 2,083
大本德 1,693
波尔克 1,415

系统总

5,191
需求

Tampa Electric's Peak demands occur in the winter because of electric heating. An all-time winter instantaneous peak load record of 4,760 MW was set on January 11, 2010. Summer peaks are brought on by air conditioning. An all-time summer instantaneous peak load record of 4,514 megawatts was set on August 18, 2021.

监管

Tampa Electric's retail and wholesale operations are regulated by the Florida Public Service Commission and Federal Energy Regulatory Commission, 分别. Prices allowed by both agencies are generally based on recovery of prudent costs incurred plus a reasonable return on invested capital.